Our tactic: team play!

The refurbishment project was real team play: in close coordination between MEC, owners, tenants and the city, the location was upgraded to the maximum and today offers local amenities including sports and fun. The social responsibility for the residents of the residential area was taken seriously - in addition to a future-oriented mix of shops and offers, the Decathlon Playground is now an outdoor area that can be used free of charge for various sports.

Key Facts

The functional concept

Aus einem auf zwei Ebenen konzipierten Baumarkt als eigenständigem Bauteil wird in der Nachnutzung eine in das Center integrierte flexibel umnutzbare Fläche für mehrere Neumieter. Das Ziel: Nachhaltige Standortbelegung mit größtmöglichem Komfort für Mieter und Centerbesucher. Durch diese Neuausrichtung wurden im rückwärtigen Gebäudeteil für die Belieferung der Händler komplett neue Andienungen mit Lagerräumen geschaffen. Zudem wurde für die Anlieferung des Sportmarktes ein Lastenaufzug in einem neu errichteten Gebäudeteil eingebaut.

Da der Sportmarkt im 1. OG vom EG entkoppelt wurde, ist die Zuwegung der Kunden über ein neues Rolltreppen-Eingangsbauwerk inklusive einem Kundenaufzug (Barrierefreiheit) ermöglicht worden. Die Fassadenerhöhung im Bereich des neu eingezogenen Sportmarktes Decathlon dient zugleich als signifikantes neues Gestaltungselement mit Eyecatchereffekt und erhöht zugleich Sichtbarkeit und Unverwechselbarkeit des Centers.

The comprehensive redesign of the T.E.C. was carried out taking into account the wishes of the tenants with the aim of upgrading the center from the 90s to a mall of the 2020s. The revised CI, the new façade fronts, contemporary interior design and the innovative visitor services - all this together ensures a high quality of stay today.

Confidently transformed - customer needs, shopping trends and sustainability

  • Restructuring of the mall through the use of varying facade applications
  • Varied tenant advertisements in the mall sequence
  • New color concept for the facade and the interior areas
  • Development of a new logo
  • Further development of all wayfinding and orientation elements
  • Conception of the common areas as trendy lounges including charging sockets
  • Refurbishment of the gastro area into a food hall
  • Innovative and sustainable customer services such as covered bicycle parking spaces, public WiFi and charging stations for e-bikes
  • 1,400 free parking spaces, 212 of which are in XXL format
  • Refurbishment of the toilets with a design derived from the hotel industry
  • Lighting with the latest LED technology
  • Modern air conditioning and ventilation technology
  • Outdoor ball sports area for free use by local residents

Responsibility for the environment, the environment and the future.

Successful revitalization